Intelligent Production Line for Construction Hoist Mast Sections


• The entire line is equipped with 12 welding robots, 8 handling robots, an RGV system, a main chord processing system, as well as weld seam and precision inspection devices.
• Enables fully automated processes from raw material feeding of main chords to automatic assembly and welding of components such as positioning sleeves, web member, and angle steel.
• Integrated with information systems, monitoring systems, central control systems, and identification systems to achieve data acquisition, status monitoring, and traceability.
JINNTA

Quote Now


To provide you with quality products and services